Triple
T8929794
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Martorell Technical Center |
E212622
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | engineering facility |
C7750
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: engineering facility Context triple: [Martorell Technical Center, instanceOf, engineering facility]
-
A.
infrastructure facility
An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
-
B.
production facility
A production facility is a physical site equipped with machinery, resources, and personnel dedicated to manufacturing goods or processing materials at scale.
-
C.
weapons testing facility
A weapons testing facility is a secure, controlled site where weapons and related systems are developed, evaluated, and tested for performance, safety, and reliability.
-
D.
facility
A facility is a physical place or infrastructure designed and equipped to support specific activities, services, or operations.
-
E.
testing facility
chosen
A testing facility is a specialized environment equipped with tools, equipment, and procedures designed to systematically evaluate, measure, and validate the performance, safety, or quality of products, systems, or processes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8395c438819087d7cb844ab5990c |
completed | March 30, 2026, 2:07 p.m. |
Created at: March 30, 2026, 6:57 p.m.