Triple

T8841843
Position Surface form Disambiguated ID Type / Status
Subject Chasing Pavements E210405 entity
Predicate album P1995 FINISHED
Object 19 E210416 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 19 | Statement: [Chasing Pavements, album, 19]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: 19
Context triple: [Chasing Pavements, album, 19]
  • A. 19 chosen
    19 is the debut studio album by English singer-songwriter Adele, showcasing her soulful vocals and confessional songwriting that first brought her widespread acclaim.
  • B. 21
    21 is Adele’s critically acclaimed, Grammy-winning sophomore album known for its soulful exploration of heartbreak and emotional resilience.
  • C. 13
    13 is the nineteenth and final studio album by English heavy metal band Black Sabbath, marking their reunion with original vocalist Ozzy Osbourne and a return to their classic doom-laden sound.
  • D. A19
    A19 is a major road in northern England that runs roughly north–south, linking areas such as Doncaster, York, Teesside, and Tyneside.
  • E. 40
    40 is the professional name of Noah "40" Shebib, a Canadian record producer, songwriter, and engineer best known for his long-standing collaboration with Drake and shaping the sound of modern hip-hop and R&B.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca838967bc8190b46c3c80a2887ea4 completed March 30, 2026, 2:07 p.m.
NER Named-entity recognition batch_69cc60876c6c8190b1b490e447e1cf4b completed April 1, 2026, 12:02 a.m.
NED1 Entity disambiguation (via context triple) batch_69cf89a41a2c8190b69e5a1b157f9325 completed April 3, 2026, 9:34 a.m.
Created at: March 30, 2026, 6:48 p.m.