Triple
T8841208
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Oasis |
E210393
|
entity |
| Predicate | single |
P3283
|
FINISHED |
| Object | Cuidao por Ahí |
E761144
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cuidao por Ahí | Statement: [Oasis, single, Cuidao por Ahí]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Cuidao por Ahí Context triple: [Oasis, single, Cuidao por Ahí]
-
A.
Cuidao por Ahí
chosen
"Cuidao por Ahí" is a song featured on the album "Oasis," the collaborative project by Latin artists Bad Bunny and J Balvin.
-
B.
Me Curaré
"Me Curaré" is a song by Spanish singer-songwriter Leiva from his acclaimed solo album "Odisea."
-
C.
Lo Que Más
"Lo Que Más" is a Spanish-language pop ballad by Colombian singer Shakira, featured on her 2010 studio album "Sale el Sol."
-
D.
Se Preparó
"Se Preparó" is a popular reggaeton song by Puerto Rican singer Ozuna that helped solidify his rise in Latin urban music.
-
E.
Del lado de acá
"Del lado de acá" is the first section of Julio Cortázar’s novel "Rayuela," presenting the protagonist’s life and existential wanderings in Paris.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca838967bc8190b46c3c80a2887ea4 |
completed | March 30, 2026, 2:07 p.m. |
| NER | Named-entity recognition | batch_69cc60876c6c8190b1b490e447e1cf4b |
completed | April 1, 2026, 12:02 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cfa0721430819091abe8c13a745725 |
completed | April 3, 2026, 11:11 a.m. |
Created at: March 30, 2026, 6:48 p.m.