Triple
T8820639
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | WWDC 2023 |
E209893
|
entity |
| Predicate | announcedTool |
P8467
|
FINISHED |
| Object | Xcode 15 |
E41456
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Xcode 15 | Statement: [WWDC 2023, announcedTool, Xcode 15]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Xcode 15 Context triple: [WWDC 2023, announcedTool, Xcode 15]
-
A.
Xcode
chosen
Xcode is Apple's integrated development environment (IDE) for creating software across macOS, iOS, watchOS, and tvOS platforms.
-
B.
iOS 15
iOS 15 is a major version of Apple's mobile operating system that introduced enhanced privacy features, redesigned notifications, and improvements to FaceTime and system-wide focus tools.
-
C.
Xcode Server
Xcode Server is Apple's continuous integration service for building, testing, and analyzing iOS and macOS apps developed with Xcode.
-
D.
macOS Sequoia
macOS Sequoia is a version of Apple's macOS operating system designed for modern Macs, featuring updated productivity tools, enhanced continuity with iPhone and iPad, and performance and security improvements.
-
E.
macOS Ventura
macOS Ventura is a version of Apple's desktop operating system for Mac computers, introducing features like Stage Manager, Continuity Camera, and enhanced collaboration tools.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8364e13081909c85fe80f44fe86f |
completed | March 30, 2026, 2:06 p.m. |
| NER | Named-entity recognition | batch_69cc600fbbac8190ad36d93fff60a33f |
completed | April 1, 2026, midnight |
| NED1 | Entity disambiguation (via context triple) | batch_69cf6fd064208190b1c8e1e1848763d2 |
completed | April 3, 2026, 7:44 a.m. |
Created at: March 30, 2026, 6:46 p.m.