Triple

T8817663
Position Surface form Disambiguated ID Type / Status
Subject Wolfe Island Wind Project E209820 entity
Predicate connectsTo P845 FINISHED
Object Hydro One transmission system E325248 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hydro One transmission system | Statement: [Wolfe Island Wind Project, connectsTo, Hydro One transmission system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Hydro One transmission system
Context triple: [Wolfe Island Wind Project, connectsTo, Hydro One transmission system]
  • A. Ontario electricity grid chosen
    The Ontario electricity grid is the province-wide interconnected network of power generation, transmission, and distribution infrastructure that delivers electricity to homes, businesses, and industries across Ontario, Canada.
  • B. Mississauga Power
    Mississauga Power was a professional basketball team based in Mississauga, Ontario, that competed in the National Basketball League of Canada.
  • C. La Tuque Generating Station
    La Tuque Generating Station is a major hydroelectric power plant in Quebec, Canada, that harnesses the flow of the Saint-Maurice River to generate electricity.
  • D. Ontario Power Generation
    Ontario Power Generation is a large, government-owned electricity producer in Ontario, Canada, primarily known for operating nuclear, hydroelectric, and other power generating stations across the province.
  • E. Robert-Bourassa generating station
    The Robert-Bourassa generating station is a massive hydroelectric power plant in northern Quebec and one of the key facilities in Hydro-Québec’s La Grande complex.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8364e13081909c85fe80f44fe86f completed March 30, 2026, 2:06 p.m.
NER Named-entity recognition batch_69cc600d267c81909e145e58af08e523 completed April 1, 2026, midnight
NED1 Entity disambiguation (via context triple) batch_69cf6fc1579c8190ade0f780183aa1dc completed April 3, 2026, 7:44 a.m.
Created at: March 30, 2026, 6:46 p.m.