Triple

T87757
Position Surface form Disambiguated ID Type / Status
Subject Bourne Bridge E1763 entity
Predicate hasApproachRoad P4067 FINISHED
Object Route 25 (via Route 28 connection)
Route 25 (via Route 28 connection) is a highway approach route that links traffic from Route 28 to the Bourne Bridge, providing access to Cape Cod.
E6480 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Route 25 (via Route 28 connection) | Statement: [Bourne Bridge, hasApproachRoad, Route 25 (via Route 28 connection)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Route 25 (via Route 28 connection)
Context triple: [Bourne Bridge, hasApproachRoad, Route 25 (via Route 28 connection)]
  • A. Route 2 (Massachusetts)
    Route 2 (Massachusetts) is a major east–west state highway that connects the Boston area with north-central and western Massachusetts, serving as a key commuter and regional travel corridor.
  • B. Route 16 (Revere Beach Parkway)
    Route 16 (Revere Beach Parkway) is a major urban arterial roadway in the Greater Boston area that connects several North Shore communities and provides key access to Revere Beach and surrounding neighborhoods.
  • C. U.S. Route 9
    U.S. Route 9 is a major north–south U.S. highway running along the East Coast, primarily through New York and New Jersey, connecting numerous cities and historic communities.
  • D. Interstate 395
    Interstate 395 is a major auxiliary Interstate Highway in the eastern United States that connects Washington, D.C. with suburban Virginia and serves as a key commuter and regional traffic corridor.
  • E. Georgia State Route 85
    Georgia State Route 85 is a primary north–south state highway in western Georgia that connects several communities, including Warm Springs, to the Atlanta metropolitan area.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Route 25 (via Route 28 connection)
Triple: [Bourne Bridge, hasApproachRoad, Route 25 (via Route 28 connection)]
Generated description
Route 25 (via Route 28 connection) is a highway approach route that links traffic from Route 28 to the Bourne Bridge, providing access to Cape Cod.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Route 25 (via Route 28 connection)
Target entity description: Route 25 (via Route 28 connection) is a highway approach route that links traffic from Route 28 to the Bourne Bridge, providing access to Cape Cod.
  • A. Route 2 (Massachusetts)
    Route 2 (Massachusetts) is a major east–west state highway that connects the Boston area with north-central and western Massachusetts, serving as a key commuter and regional travel corridor.
  • B. Route 16 (Revere Beach Parkway)
    Route 16 (Revere Beach Parkway) is a major urban arterial roadway in the Greater Boston area that connects several North Shore communities and provides key access to Revere Beach and surrounding neighborhoods.
  • C. U.S. Route 9
    U.S. Route 9 is a major north–south U.S. highway running along the East Coast, primarily through New York and New Jersey, connecting numerous cities and historic communities.
  • D. Interstate 395
    Interstate 395 is a major auxiliary Interstate Highway in the eastern United States that connects Washington, D.C. with suburban Virginia and serves as a key commuter and regional traffic corridor.
  • E. Georgia State Route 85
    Georgia State Route 85 is a primary north–south state highway in western Georgia that connects several communities, including Warm Springs, to the Atlanta metropolitan area.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasApproachRoad
Context triple: [Bourne Bridge, hasApproachRoad, Route 25 (via Route 28 connection)]
  • A. hasMajorHighway
    Indicates that a location or area is served by or directly connected to a major highway route.
  • B. roadFeature
    Indicates that an entity is a specific physical or functional characteristic associated with a road, such as its structure, markings, or related infrastructure.
  • C. hasLanes
    Indicates that an entity, such as a road or pathway, is divided into one or more distinct lanes for traffic or movement.
  • D. roadType
    Indicates the classification or category of a road based on its functional or physical characteristics.
  • E. hasStreet
    Indicates that an entity is located on, associated with, or identified by a particular street.
  • F. None of above. chosen

Provenance (7 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a24c8150408190910a693eb51c1f71 completed Feb. 28, 2026, 2:01 a.m.
NER Named-entity recognition batch_69a2503d304c8190a0034ffa4a38a501 completed Feb. 28, 2026, 2:17 a.m.
NED1 Entity disambiguation (via context triple) batch_69a25abf2e9c8190bb09baca150145ed completed Feb. 28, 2026, 3:02 a.m.
NEDg Description generation batch_69a25ba974948190bb064dca99613bc6 completed Feb. 28, 2026, 3:06 a.m.
NED2 Entity disambiguation (via description) batch_69a25c2b29e08190af62c6753c4fdd11 completed Feb. 28, 2026, 3:08 a.m.
PD Predicate disambiguation batch_69a24eb6da2c8190a33d144d219f7abe completed Feb. 28, 2026, 2:11 a.m.
PDg Predicate description generation batch_69a2503c12808190a3cbb7b171f466f0 completed Feb. 28, 2026, 2:17 a.m.
Created at: Feb. 28, 2026, 2:06 a.m.