Triple

T8754502
Position Surface form Disambiguated ID Type / Status
Subject Nizhny Novgorod Cableway E208040 entity
Predicate instanceOf P0 FINISHED
Object urban cable car line C1080 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban cable car line
Context triple: [Nizhny Novgorod Cableway, instanceOf, urban cable car line]
  • A. urban rail loop line
    An urban rail loop line is a circular or near-circular transit route within a city that connects multiple districts and intersecting lines, allowing continuous, bidirectional travel without a terminal endpoint.
  • B. cable car system chosen
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • C. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • D. rapid transit line segment
    A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
  • E. monorail-served city
    A monorail-served city is an urban area whose public transportation network prominently features one or more elevated monorail lines that provide regular passenger service and integrate with the city’s overall mobility system.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca835cd6b08190bd7c63db92f53c86 completed March 30, 2026, 2:06 p.m.
Created at: March 30, 2026, 6:39 p.m.