Triple

T8727677
Position Surface form Disambiguated ID Type / Status
Subject Minidoka Dam E207169 entity
Predicate locatedUpstreamOf P5955 FINISHED
Object American Falls Dam E205621 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: American Falls Dam | Statement: [Minidoka Dam, locatedUpstreamOf, American Falls Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: American Falls Dam
Context triple: [Minidoka Dam, locatedUpstreamOf, American Falls Dam]
  • A. American Falls Dam chosen
    American Falls Dam is a major irrigation and hydroelectric dam in southeastern Idaho that creates the American Falls Reservoir on the Snake River.
  • B. Upper Falls Dam
    Upper Falls Dam is a hydroelectric dam on the Spokane River in Spokane, Washington, that helps generate power from the Spokane Falls.
  • C. Lower Falls Dam
    Lower Falls Dam is a hydroelectric dam located on the Spokane River in Spokane, Washington, used primarily for power generation.
  • D. Post Falls Dam
    Post Falls Dam is a hydroelectric dam on the Spokane River in northern Idaho that helps generate power and regulate water levels in the region.
  • E. Gardiner Dam
    Gardiner Dam is one of Canada's largest earth-filled dams, located in Saskatchewan and forming Lake Diefenbaker for hydroelectric power, irrigation, and flood control.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca835811d8819081ea00fd2a2c9a1c completed March 30, 2026, 2:06 p.m.
NER Named-entity recognition batch_69cc5d1890e0819088b271db51faa738 completed March 31, 2026, 11:47 p.m.
NED1 Entity disambiguation (via context triple) batch_69d02f6e221081909a8a83f2e465b1c2 completed April 3, 2026, 9:21 p.m.
Created at: March 30, 2026, 6:37 p.m.