Triple

T871089
Position Surface form Disambiguated ID Type / Status
Subject A24 road E18813 entity
Predicate hasJunctionWith P1018 FINISHED
Object A27 road
The A27 road is a major east–west trunk route along England’s south coast, linking key towns and cities between Hampshire and East Sussex.
E233232 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A27 road | Statement: [A24 road, hasJunctionWith, A27 road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A27 road
Context triple: [A24 road, hasJunctionWith, A27 road]
  • A. A22 road
    The A22 road is a major route in southeast England connecting London with Eastbourne on the south coast.
  • B. A23 road
    The A23 road is a major route in southern England connecting London to Brighton, serving as a key corridor between the capital and the south coast.
  • C. A272 road
    The A272 road is a major east–west route in southern England, running largely through rural Hampshire and West Sussex and known for its scenic countryside drive.
  • D. A25 road
    The A25 road is an important east–west route in South East England that runs through Surrey and connects several towns between Guildford and Sevenoaks.
  • E. A21 road
    The A21 road is a major route in southeast England that connects London with Hastings on the south coast, passing through Kent and East Sussex.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: A27 road
Triple: [A24 road, hasJunctionWith, A27 road]
Generated description
The A27 road is a major east–west trunk route along England’s south coast, linking key towns and cities between Hampshire and East Sussex.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: A27 road
Target entity description: The A27 road is a major east–west trunk route along England’s south coast, linking key towns and cities between Hampshire and East Sussex.
  • A. A22 road
    The A22 road is a major route in southeast England connecting London with Eastbourne on the south coast.
  • B. A23 road
    The A23 road is a major route in southern England connecting London to Brighton, serving as a key corridor between the capital and the south coast.
  • C. A272 road
    The A272 road is a major east–west route in southern England, running largely through rural Hampshire and West Sussex and known for its scenic countryside drive.
  • D. A25 road
    The A25 road is an important east–west route in South East England that runs through Surrey and connects several towns between Guildford and Sevenoaks.
  • E. A21 road
    The A21 road is a major route in southeast England that connects London with Hastings on the south coast, passing through Kent and East Sussex.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4938db1f081909bcd1ad2713b6096 completed March 1, 2026, 7:29 p.m.
NER Named-entity recognition batch_69a4ac94d5ac81909feee876696da589 completed March 1, 2026, 9:16 p.m.
NED1 Entity disambiguation (via context triple) batch_69ae3032c1588190bae02f0e2152c6f1 completed March 9, 2026, 2:28 a.m.
NEDg Description generation batch_69ae30f6b7c4819080cb7cb7adc1f6d3 completed March 9, 2026, 2:31 a.m.
NED2 Entity disambiguation (via description) batch_69ae31849d7c8190a4e3c90334bf21a5 completed March 9, 2026, 2:33 a.m.
Created at: March 1, 2026, 7:39 p.m.