Triple
T871089
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | A24 road |
E18813
|
entity |
| Predicate | hasJunctionWith |
P1018
|
FINISHED |
| Object |
A27 road
The A27 road is a major east–west trunk route along England’s south coast, linking key towns and cities between Hampshire and East Sussex.
|
E233232
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A27 road | Statement: [A24 road, hasJunctionWith, A27 road]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: A27 road Context triple: [A24 road, hasJunctionWith, A27 road]
-
A.
A22 road
The A22 road is a major route in southeast England connecting London with Eastbourne on the south coast.
-
B.
A23 road
The A23 road is a major route in southern England connecting London to Brighton, serving as a key corridor between the capital and the south coast.
-
C.
A272 road
The A272 road is a major east–west route in southern England, running largely through rural Hampshire and West Sussex and known for its scenic countryside drive.
-
D.
A25 road
The A25 road is an important east–west route in South East England that runs through Surrey and connects several towns between Guildford and Sevenoaks.
-
E.
A21 road
The A21 road is a major route in southeast England that connects London with Hastings on the south coast, passing through Kent and East Sussex.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: A27 road Triple: [A24 road, hasJunctionWith, A27 road]
Generated description
The A27 road is a major east–west trunk route along England’s south coast, linking key towns and cities between Hampshire and East Sussex.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: A27 road Target entity description: The A27 road is a major east–west trunk route along England’s south coast, linking key towns and cities between Hampshire and East Sussex.
-
A.
A22 road
The A22 road is a major route in southeast England connecting London with Eastbourne on the south coast.
-
B.
A23 road
The A23 road is a major route in southern England connecting London to Brighton, serving as a key corridor between the capital and the south coast.
-
C.
A272 road
The A272 road is a major east–west route in southern England, running largely through rural Hampshire and West Sussex and known for its scenic countryside drive.
-
D.
A25 road
The A25 road is an important east–west route in South East England that runs through Surrey and connects several towns between Guildford and Sevenoaks.
-
E.
A21 road
The A21 road is a major route in southeast England that connects London with Hastings on the south coast, passing through Kent and East Sussex.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a4938db1f081909bcd1ad2713b6096 |
completed | March 1, 2026, 7:29 p.m. |
| NER | Named-entity recognition | batch_69a4ac94d5ac81909feee876696da589 |
completed | March 1, 2026, 9:16 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ae3032c1588190bae02f0e2152c6f1 |
completed | March 9, 2026, 2:28 a.m. |
| NEDg | Description generation | batch_69ae30f6b7c4819080cb7cb7adc1f6d3 |
completed | March 9, 2026, 2:31 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69ae31849d7c8190a4e3c90334bf21a5 |
completed | March 9, 2026, 2:33 a.m. |
Created at: March 1, 2026, 7:39 p.m.