Triple
T87064
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Five-Year Plans for the National Economy of the Soviet Union |
E1750
|
entity |
| Predicate | planningHorizon |
P302
|
FINISHED |
| Object | five years |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: five years | Statement: [Five-Year Plans for the National Economy of the Soviet Union, planningHorizon, five years]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: planningHorizon Context triple: [Five-Year Plans for the National Economy of the Soviet Union, planningHorizon, five years]
-
A.
timePeriod
chosen
Indicates the specific span or interval of time during which an event, state, or relationship occurs or is valid.
-
B.
focusPeriod
Indicates the specific time span during which attention, activity, or analysis is concentrated on something.
-
C.
plannedFacility
Indicates that a facility is intended or scheduled to be built, established, or implemented in the future but does not yet exist or operate.
-
D.
envisionedAs
Indicates that one entity is mentally pictured, imagined, or conceived in terms of another entity or role.
-
E.
commitmentTiming
Indicates the point in time or period relative to an event or agreement when a commitment is made, becomes effective, or is expected to be fulfilled.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a24c8150408190910a693eb51c1f71 |
completed | Feb. 28, 2026, 2:01 a.m. |
| NER | Named-entity recognition | batch_69a2503d304c8190a0034ffa4a38a501 |
completed | Feb. 28, 2026, 2:17 a.m. |
| PD | Predicate disambiguation | batch_69a24eb6da2c8190a33d144d219f7abe |
completed | Feb. 28, 2026, 2:11 a.m. |
Created at: Feb. 28, 2026, 2:06 a.m.