Triple
T8668590
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Antwerp-Central railway station |
E205738
|
entity |
| Predicate | operatedBy |
P86
|
FINISHED |
| Object | NMBS-SNCB |
E78978
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NMBS-SNCB | Statement: [Antwerp-Central railway station, operatedBy, NMBS-SNCB]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: NMBS-SNCB Context triple: [Antwerp-Central railway station, operatedBy, NMBS-SNCB]
-
A.
SNCB/NMBS
chosen
SNCB/NMBS is the Belgian national railway company responsible for operating most passenger train services and managing much of the rail infrastructure in Belgium.
-
B.
Infrabel
Infrabel is the Belgian railway infrastructure manager responsible for the construction, maintenance, and operation of the national rail network.
-
C.
Intercity Brussels
Intercity Brussels is an international high-speed train service connecting the Netherlands with Brussels in Belgium.
-
D.
Belgian railway network
The Belgian railway network is a dense, electrified rail system covering all regions of Belgium and connecting major cities domestically and internationally.
-
E.
Brussels suburban rail network
The Brussels suburban rail network is a regional commuter rail system serving Brussels and its surrounding areas, connecting the city with nearby towns and suburbs through frequent train services.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca83516ae88190aefe034b3bc589e3 |
completed | March 30, 2026, 2:06 p.m. |
| NER | Named-entity recognition | batch_69cc48a48b548190b78259072b1224ee |
completed | March 31, 2026, 10:20 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cf426e7c54819086d35609f2edf287 |
completed | April 3, 2026, 4:30 a.m. |
Created at: March 30, 2026, 6:31 p.m.