Triple
T8645082
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Loktak Lake |
E204752
|
entity |
| Predicate | hasInfrastructure |
P2560
|
FINISHED |
| Object |
Loktak Hydroelectric Project
The Loktak Hydroelectric Project is a major hydroelectric power generation facility in Manipur, India, that harnesses the waters of Loktak Lake to supply electricity to the region.
|
E747899
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Loktak Hydroelectric Project | Statement: [Loktak Lake, hasInfrastructure, Loktak Hydroelectric Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Loktak Hydroelectric Project Context triple: [Loktak Lake, hasInfrastructure, Loktak Hydroelectric Project]
-
A.
Teesta V Hydroelectric Project
Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
-
B.
Lower Subansiri Hydroelectric Project
The Lower Subansiri Hydroelectric Project is a major run-of-the-river dam and power station under construction on the Subansiri River in India, intended to generate significant hydroelectric power for the northeastern region.
-
C.
Punatsangchhu-I Hydroelectric Project
Punatsangchhu-I Hydroelectric Project is a major run-of-the-river hydropower plant under construction in Bhutan, developed with Indian assistance to generate electricity for domestic use and export.
-
D.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
E.
Parbati Hydroelectric Project
The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Loktak Hydroelectric Project Triple: [Loktak Lake, hasInfrastructure, Loktak Hydroelectric Project]
Generated description
The Loktak Hydroelectric Project is a major hydroelectric power generation facility in Manipur, India, that harnesses the waters of Loktak Lake to supply electricity to the region.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Loktak Hydroelectric Project Target entity description: The Loktak Hydroelectric Project is a major hydroelectric power generation facility in Manipur, India, that harnesses the waters of Loktak Lake to supply electricity to the region.
-
A.
Teesta V Hydroelectric Project
Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
-
B.
Lower Subansiri Hydroelectric Project
The Lower Subansiri Hydroelectric Project is a major run-of-the-river dam and power station under construction on the Subansiri River in India, intended to generate significant hydroelectric power for the northeastern region.
-
C.
Punatsangchhu-I Hydroelectric Project
Punatsangchhu-I Hydroelectric Project is a major run-of-the-river hydropower plant under construction in Bhutan, developed with Indian assistance to generate electricity for domestic use and export.
-
D.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
E.
Parbati Hydroelectric Project
The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca834ca1c88190a11ffb0200342fac |
completed | March 30, 2026, 2:06 p.m. |
| NER | Named-entity recognition | batch_69cc479999c881908c0c4e01c07d02d4 |
completed | March 31, 2026, 10:15 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cebc42922c819099a464d2e347dec4 |
completed | April 2, 2026, 6:58 p.m. |
| NEDg | Description generation | batch_69cec03fa5dc8190bbfe40aa1a3b27c1 |
completed | April 2, 2026, 7:15 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69cec0cac51c8190962a23d53c1fb48b |
completed | April 2, 2026, 7:17 p.m. |
Created at: March 30, 2026, 6:28 p.m.