Triple

T8640611
Position Surface form Disambiguated ID Type / Status
Subject Exploration Ground Systems Program E204635 entity
Predicate usesFacility P105 FINISHED
Object Launch Control Center E81036 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Launch Control Center | Statement: [Exploration Ground Systems Program, usesFacility, Launch Control Center]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Launch Control Center
Context triple: [Exploration Ground Systems Program, usesFacility, Launch Control Center]
  • A. Launch Control Center chosen
    The Launch Control Center is NASA’s primary command facility at Kennedy Space Center where engineers and controllers manage and oversee rocket launches.
  • B. Launch Control Centre
    The Launch Control Centre at the Satish Dhawan Space Centre is the primary command and monitoring hub for managing and overseeing India’s rocket launches.
  • C. Control Center
    Control Center is a macOS interface element that provides quick access to essential system controls and settings like Wi‑Fi, Bluetooth, display, and audio from a single menu.
  • D. Launch Control Center Firing Rooms
    The Launch Control Center Firing Rooms are specialized control rooms at NASA’s Kennedy Space Center where engineers and flight controllers manage and oversee rocket launch operations.
  • E. Control Panel
    Control Panel is a Windows feature that provides a centralized interface for configuring system settings, hardware, software, and user accounts.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca834ca1c88190a11ffb0200342fac completed March 30, 2026, 2:06 p.m.
NER Named-entity recognition batch_69cc47944d1c819081f448f14d04bf9d completed March 31, 2026, 10:15 p.m.
NED1 Entity disambiguation (via context triple) batch_69cebc340528819085c80b69d6d32a34 completed April 2, 2026, 6:57 p.m.
Created at: March 30, 2026, 6:28 p.m.