Triple
T8617701
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Perth Amboy station |
E204082
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | New Jersey Transit station |
C374
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: New Jersey Transit station Context triple: [Perth Amboy station, instanceOf, New Jersey Transit station]
-
A.
commuter rail station
chosen
A commuter rail station is a designated facility where passengers board and alight regional trains that connect suburbs or outlying areas with urban centers, typically offering platforms, ticketing, and basic passenger amenities.
-
B.
MBTA Commuter Rail station
An MBTA Commuter Rail station is a designated passenger facility along the Massachusetts Bay Transportation Authority’s regional rail network where trains stop to allow riders to board, alight, and connect with other modes of transit.
-
C.
Long Island Rail Road facility
A Long Island Rail Road facility is any physical site, such as stations, yards, maintenance shops, or administrative buildings, that supports the operation, maintenance, and management of the Long Island Rail Road network.
-
D.
AeroTrain station
An AeroTrain station is a designated facility where passengers board, disembark, and transfer between AeroTrains, providing platforms, ticketing, waiting areas, and related services for high-speed or automated airport rail transit.
-
E.
New York City Subway–railroad interchange
A New York City Subway–railroad interchange is a facility or location where subway lines physically connect with or provide direct transfer to mainline or commuter rail services, enabling passenger and sometimes equipment movement between the two systems.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca832ceab8819096e4a9f546695079 |
completed | March 30, 2026, 2:05 p.m. |
Created at: March 30, 2026, 6:26 p.m.