Triple

T8617253
Position Surface form Disambiguated ID Type / Status
Subject Maine State Route 111 E204070 entity
Predicate abbreviation P43 FINISHED
Object SR 111
SR 111 is a state highway in Maine that runs east–west, connecting the city of Biddeford to the town of Alfred and serving as an important regional route in York County.
E748494 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 111 | Statement: [Maine State Route 111, abbreviation, SR 111]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SR 111
Context triple: [Maine State Route 111, abbreviation, SR 111]
  • A. SR 110
    SR 110 is a state highway designation used for a specific numbered route within a U.S. state's road network.
  • B. SR 113
    SR 113 is a state highway in northern Ohio that runs east–west through several counties, connecting rural areas with small towns and cities.
  • C. SR 11
    SR 11 is a planned and partially completed state highway intended to serve as a transportation corridor within its state’s road network.
  • D. SR 116
    SR 116 is a state highway in Georgia that serves as an east–west transportation route connecting several communities in the west-central part of the state.
  • E. SR 116
    SR 116 is a state highway in Tennessee that serves as a regional connector route through rural communities.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: SR 111
Triple: [Maine State Route 111, abbreviation, SR 111]
Generated description
SR 111 is a state highway in Maine that runs east–west, connecting the city of Biddeford to the town of Alfred and serving as an important regional route in York County.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: SR 111
Target entity description: SR 111 is a state highway in Maine that runs east–west, connecting the city of Biddeford to the town of Alfred and serving as an important regional route in York County.
  • A. SR 110
    SR 110 is a state highway designation used for a specific numbered route within a U.S. state's road network.
  • B. SR 113
    SR 113 is a state highway in northern Ohio that runs east–west through several counties, connecting rural areas with small towns and cities.
  • C. SR 11
    SR 11 is a planned and partially completed state highway intended to serve as a transportation corridor within its state’s road network.
  • D. SR 116
    SR 116 is a state highway in Georgia that serves as an east–west transportation route connecting several communities in the west-central part of the state.
  • E. SR 116
    SR 116 is a state highway in Tennessee that serves as a regional connector route through rural communities.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca832ceab8819096e4a9f546695079 completed March 30, 2026, 2:05 p.m.
NER Named-entity recognition batch_69cc4711c7748190af26ff5a78ef66a2 completed March 31, 2026, 10:13 p.m.
NED1 Entity disambiguation (via context triple) batch_69cecc8b99cc8190b319a435f456ec05 completed April 2, 2026, 8:07 p.m.
NEDg Description generation batch_69cece8c4bdc8190988990c675f50f86 completed April 2, 2026, 8:16 p.m.
NED2 Entity disambiguation (via description) batch_69cecf3a0e78819082cc7c43eceae309 completed April 2, 2026, 8:19 p.m.
Created at: March 30, 2026, 6:26 p.m.