Triple

T857634
Position Surface form Disambiguated ID Type / Status
Subject Delta Works E18527 entity
Predicate instanceOf P0 FINISHED
Object hydraulic engineering project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hydraulic engineering project
Context triple: [Delta Works, instanceOf, hydraulic engineering project]
  • A. water management project
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • B. water transfer project
    A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
  • C. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • D. concrete dam
    A concrete dam is a massive engineered barrier constructed primarily from concrete to hold back and control the flow of water in a river or reservoir.
  • E. hydrology programme
    A hydrology programme is an organized set of activities, studies, and management actions focused on monitoring, analyzing, and managing the distribution, movement, and quality of water within a defined region or system.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4938bdd3c8190a954a3c11844d9cf completed March 1, 2026, 7:29 p.m.
Created at: March 1, 2026, 7:39 p.m.