Triple

T8552828
Position Surface form Disambiguated ID Type / Status
Subject Cự Khối E202484 entity
Predicate subdivisionOf P258 FINISHED
Object Long Biên District E40320 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Long Biên District | Statement: [Cự Khối, subdivisionOf, Long Biên District]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Long Biên District
Context triple: [Cự Khối, subdivisionOf, Long Biên District]
  • A. Long Biên District chosen
    Long Biên District is an urban district of Hanoi, Vietnam, located on the eastern bank of the Red River and known for its rapid development and important transport links.
  • B. Đan Phượng District
    Đan Phượng District is a rural administrative district located on the outskirts of Hanoi, Vietnam.
  • C. Ba Đình District
    Ba Đình District is a central urban district of Hanoi, Vietnam, known as the political heart of the country and home to key government buildings and historical sites.
  • D. Thanh Oai District
    Thanh Oai District is a suburban administrative district of Hanoi, Vietnam, known for its traditional craft villages and rapidly urbanizing rural landscape.
  • E. Gia Lam District
    Gia Lam District is an urbanizing rural district on the eastern outskirts of Hanoi, Vietnam, known for its mix of agricultural areas, growing residential zones, and key transport links connecting the capital with surrounding provinces.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca832610e08190b3b6c6cd2c250255 completed March 30, 2026, 2:05 p.m.
NER Named-entity recognition batch_69cbe8882704819094b688d46169433a completed March 31, 2026, 3:30 p.m.
NED1 Entity disambiguation (via context triple) batch_69d0b1495b3081909be160d97179b6e1 completed April 4, 2026, 6:35 a.m.
Created at: March 30, 2026, 6:19 p.m.