Triple
T8536213
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lennox International |
E202083
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | HVACR manufacturer |
C5242
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: HVACR manufacturer Context triple: [Lennox International, instanceOf, HVACR manufacturer]
-
A.
HVAC company
A HVAC company is a business that specializes in the installation, maintenance, and repair of heating, ventilation, and air conditioning systems for residential, commercial, or industrial clients.
-
B.
HVAC controls integrator
An HVAC controls integrator designs, configures, and implements building automation and control systems that coordinate heating, ventilation, and air conditioning equipment for efficient, reliable, and optimized operation.
-
C.
manufacturing company
A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
-
D.
manufacturer
chosen
A manufacturer is an entity that produces goods from raw materials or components, typically using machinery and labor, to supply products for distribution and sale.
-
E.
aircraft engine manufacturer
An aircraft engine manufacturer is a company that designs, develops, produces, and supports engines specifically for use in airplanes and other aircraft.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca832355b08190b8b6a4ab4a4a3554 |
completed | March 30, 2026, 2:05 p.m. |
Created at: March 30, 2026, 6:18 p.m.