Triple

T8520131
Position Surface form Disambiguated ID Type / Status
Subject Symphony No. 2 in C major, Op. 61 E201673 entity
Predicate hasFinaleCharacter P69950 FINISHED
Object triumphant LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: triumphant | Statement: [Symphony No. 2 in C major, Op. 61, hasFinaleCharacter, triumphant]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasFinaleCharacter
Context triple: [Symphony No. 2 in C major, Op. 61, hasFinaleCharacter, triumphant]
  • A. finaleCharacter chosen
    Indicates that the specified character appears or plays a significant role in the final part or ending segment of a work or event.
  • B. laterFinale
    Indicates that one event, episode, or occurrence serves as a concluding part that happens after another referenced event or finale.
  • C. finalAct
    Indicates that an action or event is the last or concluding act in a sequence or process.
  • D. originalFinale
    Indicates that something serves as the initial or authentic concluding part or ending of another work, event, or sequence.
  • E. finalAppearanceIn
    Indicates that an entity makes its last or final appearance within a specified work, episode, or context.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8321bb44819081b74df0b710276d completed March 30, 2026, 2:05 p.m.
NER Named-entity recognition batch_69cbe628f8c48190a35201f9fde605cc completed March 31, 2026, 3:20 p.m.
PD Predicate disambiguation batch_69cbd10f64b4819080859057c19e58f0 completed March 31, 2026, 1:50 p.m.
Created at: March 30, 2026, 6:16 p.m.