Triple
T8514957
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | LNER Class A4 4468 Mallard |
E201549
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | LNER Class A4 |
C3459
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: LNER Class A4 Context triple: [LNER Class A4 4468 Mallard, instanceOf, LNER Class A4]
-
A.
railway locomotive
chosen
A railway locomotive is a powered rail vehicle that provides the motive force to pull or push trains along railway tracks.
-
B.
streamlined locomotive
A streamlined locomotive is a high-speed railway engine designed with smooth, aerodynamic contours to reduce air resistance and improve efficiency and performance.
-
C.
Avro Lancaster bomber
The Avro Lancaster bomber was a British four‑engined heavy bomber of World War II, renowned for its large payload capacity, long range, and pivotal role in strategic night bombing campaigns over Europe.
-
D.
electric locomotive class
An electric locomotive class is a category of railway locomotives designed and grouped by shared technical and performance characteristics, all powered by electricity from external sources such as overhead lines or third rails.
-
E.
Group B car
A Group B car is a high-performance rally vehicle built to the FIA’s 1980s Group B regulations, characterized by extreme power, advanced technology, and minimal restrictions that led to both legendary speed and significant safety concerns.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8320e5748190ac2c585a0bba8193 |
completed | March 30, 2026, 2:05 p.m. |
Created at: March 30, 2026, 6:15 p.m.