Triple

T8496689
Position Surface form Disambiguated ID Type / Status
Subject Signature Bridge E201116 entity
Predicate instanceOf P0 FINISHED
Object bridge in India C24531 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge in India
Context triple: [Signature Bridge, instanceOf, bridge in India]
  • A. river bridge
    A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
  • B. tram bridge
    A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
  • C. bridge in the Philippines
    A bridge in the Philippines is a man-made structure that spans physical obstacles such as bodies of water, valleys, or roads within the Philippine archipelago to facilitate transportation and connectivity between different areas.
  • D. bridge in Dubai
    A bridge in Dubai is a structural crossing designed to span physical obstacles such as water or roads within the city, integrating modern engineering with the emirate’s distinctive architectural and urban landscape.
  • E. railway bridge
    A railway bridge is a structure built to carry train tracks over obstacles such as roads, rivers, valleys, or other railways, ensuring safe and continuous rail transport.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca831ee390819095fae73400bbfafc completed March 30, 2026, 2:05 p.m.
Created at: March 30, 2026, 6:13 p.m.