Triple

T8478360
Position Surface form Disambiguated ID Type / Status
Subject Operation Brock E200451 entity
Predicate instanceOf P0 FINISHED
Object road transport contingency plan C24473 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road transport contingency plan
Context triple: [Operation Brock, instanceOf, road transport contingency plan]
  • A. regional transport plan
    A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
  • B. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • C. transportation route
    A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
  • D. road infrastructure
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • E. road traffic agreement
    A road traffic agreement is a formal arrangement between parties—such as governments, municipalities, or private entities—that defines rights, responsibilities, and rules for the use, management, and regulation of road traffic within a specified area or network.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca831b17988190a1f3f3413d57b820 completed March 30, 2026, 2:05 p.m.
Created at: March 30, 2026, 6:12 p.m.