Triple
T844696
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | U.S. Route 75 |
E18251
|
entity |
| Predicate | hasAbbreviation |
P43
|
FINISHED |
| Object | US 75 |
E18251
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: US 75 | Statement: [U.S. Route 75, hasAbbreviation, US 75]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: US 75 Context triple: [U.S. Route 75, hasAbbreviation, US 75]
-
A.
U.S. Route 75
chosen
U.S. Route 75 is a major north–south U.S. Highway running from Texas through the central United States, serving as a key transportation corridor for cities such as Dallas.
-
B.
U.S. Route 501
U.S. Route 501 is a U.S. Highway running through Virginia and North Carolina that serves as a key north–south transportation corridor connecting cities such as Durham and Myrtle Beach.
-
C.
U.S. Route 95
U.S. Route 95 is a major north–south United States highway running from the Mexican border in Arizona to the Canadian border in Idaho, traversing several western states.
-
D.
Interstate 55
Interstate 55 is a major north–south U.S. highway running from Louisiana to Illinois, connecting cities such as New Orleans, Memphis, and Chicago.
-
E.
U.S. Route 50
U.S. Route 50 is a major transcontinental U.S. highway running east–west across the country from the Atlantic coast in Maryland to California, passing through numerous states and key cities along the way.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a4938b04208190b82e1df6b572c548 |
completed | March 1, 2026, 7:29 p.m. |
| NER | Named-entity recognition | batch_69a4ac09249c8190a8099b94a3c9e2cc |
completed | March 1, 2026, 9:13 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69a7929c8c9c8190a0279f347ab64765 |
completed | March 4, 2026, 2:02 a.m. |
Created at: March 1, 2026, 7:38 p.m.