Triple

T8444779
Position Surface form Disambiguated ID Type / Status
Subject Hells Canyon E199645 entity
Predicate containsDam P8736 FINISHED
Object Oxbow Dam E215459 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Oxbow Dam | Statement: [Hells Canyon, containsDam, Oxbow Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Oxbow Dam
Context triple: [Hells Canyon, containsDam, Oxbow Dam]
  • A. Oxbow Dam chosen
    Oxbow Dam is a hydroelectric dam on the Snake River in eastern Oregon, forming Oxbow Reservoir as part of the Hells Canyon Complex.
  • B. Bagnell Dam
    Bagnell Dam is a large hydroelectric dam on the Osage River in Missouri, best known for impounding the Lake of the Ozarks and serving as a major regional power and recreation infrastructure.
  • C. Nine Mile Dam
    Nine Mile Dam is a historic hydroelectric dam on Washington State’s Spokane River that has supplied power to the Spokane region since the early 20th century.
  • D. O'Shaughnessy Dam
    O'Shaughnessy Dam is a concrete arch-gravity dam in Yosemite National Park that creates the Hetch Hetchy Reservoir, supplying water and hydroelectric power to the San Francisco Bay Area.
  • E. Goodwin Dam
    Goodwin Dam is a concrete gravity diversion dam on California’s Stanislaus River that helps regulate river flow and supplies irrigation water to surrounding agricultural areas.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83170f9081909cd98f55614c6476 completed March 30, 2026, 2:05 p.m.
NER Named-entity recognition batch_69cbe3138ee08190918cd82adbe2d9a1 completed March 31, 2026, 3:06 p.m.
NED1 Entity disambiguation (via context triple) batch_69d0c696913c819089f29ec899d4ee61 completed April 4, 2026, 8:06 a.m.
Created at: March 30, 2026, 6:09 p.m.