Triple

T842136
Position Surface form Disambiguated ID Type / Status
Subject Savannah River Site E18199 entity
Predicate formerFacility P4380 FINISHED
Object P Reactor
P Reactor was a plutonium and tritium production nuclear reactor at the U.S. Department of Energy’s Savannah River Site in South Carolina, built during the Cold War to support the nation’s nuclear weapons program.
E100463 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: P Reactor | Statement: [Savannah River Site, formerFacility, P Reactor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: P Reactor
Context triple: [Savannah River Site, formerFacility, P Reactor]
  • A. H Reactor
    H Reactor was one of the plutonium-producing nuclear reactors at the Hanford Site in Washington, built during the Cold War as part of the U.S. nuclear weapons program.
  • B. B Reactor
    B Reactor is the world’s first full-scale plutonium production reactor, built during the Manhattan Project at the Hanford Site in Washington State.
  • C. N Reactor
    N Reactor was a dual-purpose plutonium production and power-generating nuclear reactor at the Hanford Site in Washington, notable for its graphite-moderated, water-cooled design and role in the U.S. Cold War weapons program.
  • D. F Reactor
    F Reactor was one of the early plutonium production reactors at the Hanford Site in Washington, built during the Manhattan Project to support the U.S. nuclear weapons program.
  • E. C Reactor
    C Reactor is one of the early plutonium production reactors built and operated at the Hanford Site in Washington as part of the U.S. Manhattan Project and Cold War nuclear weapons program.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: P Reactor
Triple: [Savannah River Site, formerFacility, P Reactor]
Generated description
P Reactor was a plutonium and tritium production nuclear reactor at the U.S. Department of Energy’s Savannah River Site in South Carolina, built during the Cold War to support the nation’s nuclear weapons program.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: P Reactor
Target entity description: P Reactor was a plutonium and tritium production nuclear reactor at the U.S. Department of Energy’s Savannah River Site in South Carolina, built during the Cold War to support the nation’s nuclear weapons program.
  • A. H Reactor
    H Reactor was one of the plutonium-producing nuclear reactors at the Hanford Site in Washington, built during the Cold War as part of the U.S. nuclear weapons program.
  • B. B Reactor
    B Reactor is the world’s first full-scale plutonium production reactor, built during the Manhattan Project at the Hanford Site in Washington State.
  • C. N Reactor
    N Reactor was a dual-purpose plutonium production and power-generating nuclear reactor at the Hanford Site in Washington, notable for its graphite-moderated, water-cooled design and role in the U.S. Cold War weapons program.
  • D. F Reactor
    F Reactor was one of the early plutonium production reactors at the Hanford Site in Washington, built during the Manhattan Project to support the U.S. nuclear weapons program.
  • E. C Reactor
    C Reactor is one of the early plutonium production reactors built and operated at the Hanford Site in Washington as part of the U.S. Manhattan Project and Cold War nuclear weapons program.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: formerFacility
Context triple: [Savannah River Site, formerFacility, P Reactor]
  • A. formerSiteOf chosen
    Indicates that a location previously hosted or contained something (such as a structure, organization, or event) that is no longer present there.
  • B. facility
    Indicates that one entity is a building, installation, or physical infrastructure used to host, support, or enable the operations or activities of another entity.
  • C. formerHabitat
    Indicates that a location once served as a habitat for an entity but no longer does.
  • D. plannedFacility
    Indicates that a facility is intended or scheduled to be built, established, or implemented in the future but does not yet exist or operate.
  • E. formerOccupant
    Indicates that an entity previously occupied a position, role, or place but no longer does so.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4938b04208190b82e1df6b572c548 completed March 1, 2026, 7:29 p.m.
NER Named-entity recognition batch_69a4abe6f0dc8190a1bebb5e21f4ceac completed March 1, 2026, 9:13 p.m.
NED1 Entity disambiguation (via context triple) batch_69a7929a91088190bef474424bde527c completed March 4, 2026, 2:02 a.m.
NEDg Description generation batch_69a793609f148190b191c1d77cad0c80 completed March 4, 2026, 2:05 a.m.
NED2 Entity disambiguation (via description) batch_69a793d0aac081909acf83bb60fd2a2c completed March 4, 2026, 2:07 a.m.
PD Predicate disambiguation batch_69a4aa7f396c8190aa8b8dfbe0b4f732 completed March 1, 2026, 9:07 p.m.
Created at: March 1, 2026, 7:38 p.m.