Triple
T8408677
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Electricity Act 1957 |
E198565
|
entity |
| Predicate | reorganised |
P772
|
FINISHED |
| Object |
British electricity supply industry
The British electricity supply industry is the national system responsible for generating, transmitting, and distributing electrical power across Great Britain, historically shaped by state ownership, postwar nationalisation, and later market liberalisation.
|
E731422
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: British electricity supply industry | Statement: [Electricity Act 1957, reorganised, British electricity supply industry]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: British electricity supply industry Context triple: [Electricity Act 1957, reorganised, British electricity supply industry]
-
A.
British Electricity Authority
The British Electricity Authority was the nationalized body responsible for generating and supplying electricity in Great Britain in the early post-World War II period.
-
B.
Central Electricity Authority
The Central Electricity Authority is a statutory body under the Government of India responsible for overseeing and advising on the development, planning, and technical coordination of the country’s power sector.
-
C.
Central Electricity Board
The Central Electricity Board was a UK public body responsible for developing and operating the national electricity grid and coordinating power generation before being replaced by later electricity authorities.
-
D.
Central Electricity Generating Board
The Central Electricity Generating Board was the state-owned body responsible for electricity generation and bulk transmission in England and Wales from the late 1950s until privatization in the early 1990s.
-
E.
South Eastern Electricity Board
The South Eastern Electricity Board was a regional public utility in England responsible for distributing and supplying electricity across the south-eastern part of the country before industry privatization.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: British electricity supply industry Triple: [Electricity Act 1957, reorganised, British electricity supply industry]
Generated description
The British electricity supply industry is the national system responsible for generating, transmitting, and distributing electrical power across Great Britain, historically shaped by state ownership, postwar nationalisation, and later market liberalisation.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: British electricity supply industry Target entity description: The British electricity supply industry is the national system responsible for generating, transmitting, and distributing electrical power across Great Britain, historically shaped by state ownership, postwar nationalisation, and later market liberalisation.
-
A.
British Electricity Authority
The British Electricity Authority was the nationalized body responsible for generating and supplying electricity in Great Britain in the early post-World War II period.
-
B.
Central Electricity Authority
The Central Electricity Authority is a statutory body under the Government of India responsible for overseeing and advising on the development, planning, and technical coordination of the country’s power sector.
-
C.
Central Electricity Board
The Central Electricity Board was a UK public body responsible for developing and operating the national electricity grid and coordinating power generation before being replaced by later electricity authorities.
-
D.
Central Electricity Generating Board
The Central Electricity Generating Board was the state-owned body responsible for electricity generation and bulk transmission in England and Wales from the late 1950s until privatization in the early 1990s.
-
E.
South Eastern Electricity Board
The South Eastern Electricity Board was a regional public utility in England responsible for distributing and supplying electricity across the south-eastern part of the country before industry privatization.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8310df9c8190b25f16161cca3e41 |
completed | March 30, 2026, 2:05 p.m. |
| NER | Named-entity recognition | batch_69cb8315a8a8819097f6da11b909b527 |
completed | March 31, 2026, 8:17 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ce030dccf08190a70c0abf0bdcf244 |
completed | April 2, 2026, 5:47 a.m. |
| NEDg | Description generation | batch_69ce07808098819087e896b87320aefd |
completed | April 2, 2026, 6:06 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69ce08759e1c81909c96caf3b571e1ca |
completed | April 2, 2026, 6:11 a.m. |
Created at: March 30, 2026, 6:05 p.m.