Triple

T8376321
Position Surface form Disambiguated ID Type / Status
Subject Electricity (Supply) Act 1926 E197584 entity
Predicate establishedBody P7724 FINISHED
Object Central Electricity Board E719783 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Central Electricity Board | Statement: [Electricity (Supply) Act 1926, establishedBody, Central Electricity Board]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Central Electricity Board
Context triple: [Electricity (Supply) Act 1926, establishedBody, Central Electricity Board]
  • A. Central Electricity Board chosen
    The Central Electricity Board was a UK public body responsible for developing and operating the national electricity grid and coordinating power generation before being replaced by later electricity authorities.
  • B. Central Electricity Generating Board
    The Central Electricity Generating Board was the state-owned body responsible for electricity generation and bulk transmission in England and Wales from the late 1950s until privatization in the early 1990s.
  • C. Central Electricity Authority
    The Central Electricity Authority is a statutory body under the Government of India responsible for overseeing and advising on the development, planning, and technical coordination of the country’s power sector.
  • D. Southern Electricity Board
    The Southern Electricity Board was a regional public utility in the United Kingdom responsible for distributing and supplying electricity to consumers in the southern part of England before industry privatization.
  • E. Eastern Electricity Board
    The Eastern Electricity Board was a regional public utility in the United Kingdom responsible for distributing and supplying electricity across the eastern part of England before the privatization of the electricity industry.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82f64c188190af4e1608036b865d completed March 30, 2026, 2:04 p.m.
NER Named-entity recognition batch_69cb80bf6b8081909b98762b1f900bef completed March 31, 2026, 8:07 a.m.
NED1 Entity disambiguation (via context triple) batch_69cea813e384819090a8a7dc05e41ab2 completed April 2, 2026, 5:32 p.m.
Created at: March 30, 2026, 6:01 p.m.