Triple

T837268
Position Surface form Disambiguated ID Type / Status
Subject British Post Office E18095 entity
Predicate providedInfrastructure P11065 FINISHED
Object telegraph network in the United Kingdom LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: telegraph network in the United Kingdom | Statement: [British Post Office, providedInfrastructure, telegraph network in the United Kingdom]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: providedInfrastructure
Context triple: [British Post Office, providedInfrastructure, telegraph network in the United Kingdom]
  • A. usesInfrastructure
    Indicates that one entity makes use of, depends on, or operates through the infrastructure provided or managed by another entity.
  • B. supportsInfrastructure chosen
    Indicates that one entity provides resources, services, or capabilities that enable the operation, maintenance, or development of another entity’s infrastructure.
  • C. isPartOfInfrastructure
    Indicates that something belongs to, is included within, or functions as a component of a larger infrastructure system.
  • D. hasInfrastructureType
    Indicates that an entity possesses or is associated with a specific category or type of infrastructure.
  • E. infrastructureManager
    Indicates a relationship where one entity is responsible for overseeing, maintaining, or administering the infrastructure of another entity or system.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49389f44881909a608fb27d89f247 completed March 1, 2026, 7:29 p.m.
NER Named-entity recognition batch_69a4abcf69888190b342363978273ae2 completed March 1, 2026, 9:12 p.m.
PD Predicate disambiguation batch_69a4aa7dfc5c8190890c9df485d73a86 completed March 1, 2026, 9:07 p.m.
Created at: March 1, 2026, 7:38 p.m.