Triple
T8370613
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | General National Congress |
E197442
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | interim legislative body |
C2331
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: interim legislative body Context triple: [General National Congress, instanceOf, interim legislative body]
-
A.
provisional legislative body
chosen
A provisional legislative body is a temporary lawmaking assembly established to exercise legislative authority during a transitional or interim period before a permanent government structure is formed or restored.
-
B.
legislative body
A legislative body is an organized group of elected or appointed representatives empowered to create, amend, and repeal laws and oversee government policy within a political system.
-
C.
ad hoc governmental body
An ad hoc governmental body is a temporary, specially formed public entity created by a government to address a specific issue, task, or crisis and dissolved once its purpose is fulfilled.
-
D.
bicameral legislature
A bicameral legislature is a lawmaking body composed of two separate chambers or houses that must typically both approve legislation for it to become law.
-
E.
supranational parliamentary assembly
A supranational parliamentary assembly is a representative legislative body composed of delegates from multiple sovereign states, empowered to deliberate, make decisions, and sometimes enact binding rules at a level above the nation-state.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82f56730819080cec5d991c76f4c |
completed | March 30, 2026, 2:04 p.m. |
Created at: March 30, 2026, 6:01 p.m.