Triple
T8363974
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Qiansimen Bridge |
E197076
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge in Chongqing |
C22181
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge in Chongqing Context triple: [Qiansimen Bridge, instanceOf, bridge in Chongqing]
-
A.
cross-sea bridge
A cross-sea bridge is a large-scale transportation structure that spans a body of sea water to connect two land areas, enabling the passage of vehicles, trains, or pedestrians across marine environments.
-
B.
river bridge
chosen
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
-
C.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
-
D.
canal bridge
A canal bridge is a structure that carries a canal or waterway over an obstacle such as a road, river, or valley, allowing uninterrupted navigation.
-
E.
bridge in London
A bridge in London is a structural crossing over the River Thames or other waterways in the city, designed to support vehicular, rail, or pedestrian traffic while integrating with the historic and urban landscape.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82f2dbe48190aba982e75a0d94de |
completed | March 30, 2026, 2:04 p.m. |
Created at: March 30, 2026, 6 p.m.