Triple

T833031
Position Surface form Disambiguated ID Type / Status
Subject Battle of the Bogside E18008 entity
Predicate chronologicalSuccessor P78 FINISHED
Object wider August 1969 Northern Ireland riots LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: wider August 1969 Northern Ireland riots | Statement: [Battle of the Bogside, chronologicalSuccessor, wider August 1969 Northern Ireland riots]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: chronologicalSuccessor
Context triple: [Battle of the Bogside, chronologicalSuccessor, wider August 1969 Northern Ireland riots]
  • A. chronologicallyAfter
    Indicates that one event or state occurs later in time than another.
  • B. cededTo
    Indicates that control, ownership, or authority over something was formally transferred from one entity to another.
  • C. eventualSuccessor
    Indicates that one entity will become the successor of another at some later point in time, rather than immediately.
  • D. chronologicalPosition
    Indicates the relative ordering of one event or entity in time with respect to another.
  • E. successor chosen
    Indicates that one entity directly follows another in an ordered sequence or position.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49389f44881909a608fb27d89f247 completed March 1, 2026, 7:29 p.m.
NER Named-entity recognition batch_69a4abb647988190950e1790bcfa60a5 completed March 1, 2026, 9:12 p.m.
PD Predicate disambiguation batch_69a4aa7b3d2481909199f7c9f305bdfe completed March 1, 2026, 9:07 p.m.
Created at: March 1, 2026, 7:38 p.m.