Triple

T832883
Position Surface form Disambiguated ID Type / Status
Subject Marlborough Lines, Andover E18006 entity
Predicate instanceOf P0 FINISHED
Object British Army installation C1086 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: British Army installation
Context triple: [Marlborough Lines, Andover, instanceOf, British Army installation]
  • A. British Army organizational element
    A British Army organizational element is a defined structural unit—such as a section, platoon, company, battalion, brigade, or division—comprising personnel, equipment, and command relationships arranged to perform specific military roles within the Army’s hierarchy.
  • B. United States Army installation
    A United States Army installation is a designated military facility, base, or post that supports the housing, training, operations, logistics, and administration of Army personnel and equipment.
  • C. military installation chosen
    A military installation is a designated facility or area where armed forces are stationed, trained, equipped, and supported to conduct defense and security operations.
  • D. Royal Naval Air Service station
    A Royal Naval Air Service station is a military airfield or base operated by the Royal Naval Air Service for the deployment, maintenance, and support of naval aircraft and aircrew.
  • E. British Army veteran
    A British Army veteran is a former member of the United Kingdom's land warfare force who has completed their service, whether in peacetime or conflict, and is recognized for their military contribution.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49389f44881909a608fb27d89f247 completed March 1, 2026, 7:29 p.m.
Created at: March 1, 2026, 7:38 p.m.