Triple

T831844
Position Surface form Disambiguated ID Type / Status
Subject M23 motorway E17981 entity
Predicate parallelTo P1868 FINISHED
Object A23 road E196079 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A23 road | Statement: [M23 motorway, parallelTo, A23 road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A23 road
Context triple: [M23 motorway, parallelTo, A23 road]
  • A. A23 road chosen
    The A23 road is a major route in southern England connecting London to Brighton, serving as a key corridor between the capital and the south coast.
  • B. A22 road
    The A22 road is a major route in southeast England connecting London with Eastbourne on the south coast.
  • C. A25 road
    The A25 road is an important east–west route in South East England that runs through Surrey and connects several towns between Guildford and Sevenoaks.
  • D. A21 road
    The A21 road is a major route in southeast England that connects London with Hastings on the south coast, passing through Kent and East Sussex.
  • E. A24 road
    The A24 road is a major route in southeast England that connects London to the south coast, passing through counties such as Surrey and West Sussex.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4937c9c188190aaa216f6b466f452 completed March 1, 2026, 7:29 p.m.
NER Named-entity recognition batch_69a4abb4be948190ae757df85bdc40e4 completed March 1, 2026, 9:12 p.m.
NED1 Entity disambiguation (via context triple) batch_69adb5a4db2c8190830f3b2a707a3d32 completed March 8, 2026, 5:45 p.m.
Created at: March 1, 2026, 7:38 p.m.