Triple

T8307079
Position Surface form Disambiguated ID Type / Status
Subject Highland E194488 entity
Predicate transportationCorridor P385 FINISHED
Object State Route 210 E390808 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: State Route 210 | Statement: [Highland, transportationCorridor, State Route 210]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: State Route 210
Context triple: [Highland, transportationCorridor, State Route 210]
  • A. State Route 210 chosen
    State Route 210 is a major east–west freeway in Southern California that serves as part of the Foothill Freeway corridor, connecting cities across the Inland Empire and the greater Los Angeles area.
  • B. State Route 215
    State Route 215 is a major north–south freeway in Southern California that serves as a key connector between the Inland Empire cities and other regional highways.
  • C. State Route 21
    State Route 21 is a state highway in Washington that runs through rural areas including Lincoln County, connecting small communities and serving as a regional transportation corridor.
  • D. State Route 21
    State Route 21 is a major north–south highway in northeastern Ohio that serves as a key connector through cities such as Massillon.
  • E. State Route 21
    State Route 21 is a primary north–south state highway in Alabama that connects several major towns and communities across the state.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82e613e88190bf8139669bbd0d53 completed March 30, 2026, 2:04 p.m.
NER Named-entity recognition batch_69cb7f2a86bc81909749c40c640aa9f8 completed March 31, 2026, 8 a.m.
NED1 Entity disambiguation (via context triple) batch_69f018324bf88190bcd2bf168b1065d3 completed April 28, 2026, 2:15 a.m.
Created at: March 30, 2026, 5:54 p.m.