Triple

T8306369
Position Surface form Disambiguated ID Type / Status
Subject Husky Stadium E194472 entity
Predicate accessibleBy P1017 FINISHED
Object Link light rail E53254 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Link light rail | Statement: [Husky Stadium, accessibleBy, Link light rail]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Link light rail
Context triple: [Husky Stadium, accessibleBy, Link light rail]
  • A. Link light rail chosen
    Link light rail is a regional light rail transit system serving the Seattle metropolitan area in Washington State, operated by Sound Transit.
  • B. Light RailLink
    Light RailLink is a light rail transit system in the Baltimore metropolitan area that provides north–south rail service through the city and its suburbs.
  • C. METRO light rail
    METRO light rail is a rapid transit system serving the Minneapolis–Saint Paul metropolitan area with multiple color-designated lines connecting key urban, suburban, and airport destinations.
  • D. MAX Light Rail
    MAX Light Rail is the metropolitan light rail transit system serving the Portland, Oregon, metropolitan area.
  • E. METRORail light rail
    METRORail light rail is Houston's urban light rail transit system operated by METRO, connecting key destinations throughout the city’s central area.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82e613e88190bf8139669bbd0d53 completed March 30, 2026, 2:04 p.m.
NER Named-entity recognition batch_69cb7f293db08190912e5e8bb7e940cf completed March 31, 2026, 8 a.m.
NED1 Entity disambiguation (via context triple) batch_69cd955100448190862fd52d660585fd completed April 1, 2026, 9:59 p.m.
Created at: March 30, 2026, 5:54 p.m.