Triple
T8297110
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Province of Groningen |
E194246
|
entity |
| Predicate | contains |
P35
|
FINISHED |
| Object | Groningen gas field |
E242571
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Groningen gas field | Statement: [Province of Groningen, contains, Groningen gas field]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Groningen gas field Context triple: [Province of Groningen, contains, Groningen gas field]
-
A.
Zwartewaal
Zwartewaal is a small village in the western Netherlands, located in the province of South Holland.
-
B.
Borssele nuclear power plant
The Borssele nuclear power plant is a Dutch nuclear power station located in the province of Zeeland that generates electricity using a single pressurized water reactor.
-
C.
Groningen earthquake zone
chosen
The Groningen earthquake zone is a region in the Dutch province of Groningen known for frequent induced earthquakes caused by natural gas extraction.
-
D.
Oostgaarde
Oostgaarde is a residential district in the Dutch town of Capelle aan den IJssel, located near Rotterdam in the province of South Holland.
-
E.
Borssele
Borssele is a village in the Dutch province of Zeeland best known for hosting the Netherlands’ only commercial nuclear power plant.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82e50ebc81909aa7b260c76bd757 |
completed | March 30, 2026, 2:04 p.m. |
| NER | Named-entity recognition | batch_69cb7df887148190bddc2609bc885cb4 |
completed | March 31, 2026, 7:55 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cd68ad2f248190a1de95c01ddee259 |
completed | April 1, 2026, 6:49 p.m. |
Created at: March 30, 2026, 5:53 p.m.