Triple
T8236090
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Qazvin Province |
E192409
|
entity |
| Predicate | traversedBy |
P225
|
FINISHED |
| Object |
Tehran–Tabriz highway corridor
The Tehran–Tabriz highway corridor is a major transportation route in northwestern Iran that connects the capital Tehran with the city of Tabriz and serves as a key link in regional and international transit.
|
E720773
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tehran–Tabriz highway corridor | Statement: [Qazvin Province, traversedBy, Tehran–Tabriz highway corridor]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Tehran–Tabriz highway corridor Context triple: [Qazvin Province, traversedBy, Tehran–Tabriz highway corridor]
-
A.
Tehran–Mashhad highway
The Tehran–Mashhad highway is a major Iranian roadway linking the capital Tehran with the northeastern city of Mashhad, serving as a key route for both domestic travel and religious pilgrimage.
-
B.
Tehran–Karaj corridor
The Tehran–Karaj corridor is a major urban and transportation axis linking Iran’s capital Tehran with the nearby city of Karaj, forming one of the country’s most densely populated and heavily traveled metropolitan regions.
-
C.
Bandar Abbas–Tehran highway
The Bandar Abbas–Tehran highway is a major Iranian roadway that links the Persian Gulf port city of Bandar Abbas with the nation’s capital, Tehran, serving as a key north–south transport and trade corridor.
-
D.
Quetta–Taftan Highway
The Quetta–Taftan Highway is a major road in Pakistan that links the provincial capital Quetta to the town of Taftan near the Iranian border, serving as a key route for trade and travel between the two countries.
-
E.
Tehran–Tabriz railway
The Tehran–Tabriz railway is a major rail line in Iran that links the capital Tehran with the northwestern city of Tabriz, serving as a key corridor for passenger and freight transport across the country.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Tehran–Tabriz highway corridor Triple: [Qazvin Province, traversedBy, Tehran–Tabriz highway corridor]
Generated description
The Tehran–Tabriz highway corridor is a major transportation route in northwestern Iran that connects the capital Tehran with the city of Tabriz and serves as a key link in regional and international transit.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Tehran–Tabriz highway corridor Target entity description: The Tehran–Tabriz highway corridor is a major transportation route in northwestern Iran that connects the capital Tehran with the city of Tabriz and serves as a key link in regional and international transit.
-
A.
Tehran–Mashhad highway
The Tehran–Mashhad highway is a major Iranian roadway linking the capital Tehran with the northeastern city of Mashhad, serving as a key route for both domestic travel and religious pilgrimage.
-
B.
Tehran–Karaj corridor
The Tehran–Karaj corridor is a major urban and transportation axis linking Iran’s capital Tehran with the nearby city of Karaj, forming one of the country’s most densely populated and heavily traveled metropolitan regions.
-
C.
Bandar Abbas–Tehran highway
The Bandar Abbas–Tehran highway is a major Iranian roadway that links the Persian Gulf port city of Bandar Abbas with the nation’s capital, Tehran, serving as a key north–south transport and trade corridor.
-
D.
Quetta–Taftan Highway
The Quetta–Taftan Highway is a major road in Pakistan that links the provincial capital Quetta to the town of Taftan near the Iranian border, serving as a key route for trade and travel between the two countries.
-
E.
Tehran–Tabriz railway
The Tehran–Tabriz railway is a major rail line in Iran that links the capital Tehran with the northwestern city of Tabriz, serving as a key corridor for passenger and freight transport across the country.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82dc8f148190a2c75a98501a7b91 |
completed | March 30, 2026, 2:04 p.m. |
| NER | Named-entity recognition | batch_69cb782a5e18819096235679f5a644a8 |
completed | March 31, 2026, 7:30 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cd34fb069c8190965d69fae908482e |
completed | April 1, 2026, 3:08 p.m. |
| NEDg | Description generation | batch_69cd37a47f3c81909491e9b0316c32f0 |
completed | April 1, 2026, 3:20 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69cd4ecc8d68819099932b1ecefc0d36 |
completed | April 1, 2026, 4:58 p.m. |
Created at: March 30, 2026, 5:47 p.m.