Triple

T823567
Position Surface form Disambiguated ID Type / Status
Subject CERN accelerator complex E17802 entity
Predicate hasPart P35 FINISHED
Object Linac2 E13162 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Linac2 | Statement: [CERN accelerator complex, hasPart, Linac2]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Linac2
Context triple: [CERN accelerator complex, hasPart, Linac2]
  • A. Linac2 chosen
    Linac2 was CERN’s long-serving linear accelerator that pre-accelerated protons for injection into the Proton Synchrotron Booster and the rest of the accelerator complex before being superseded by Linac4.
  • B. Linac1
    Linac1 is an earlier linear accelerator facility that served as the predecessor to Linac2 in a particle physics laboratory.
  • C. Linac4
    Linac4 is a linear accelerator at CERN that serves as the first stage of the proton acceleration chain for the Large Hadron Collider and other experiments.
  • D. LINAC3
    LINAC3 is a linear accelerator at CERN that provides heavy-ion beams as part of the injector chain feeding the Large Hadron Collider.
  • E. LHC injector chain
    The LHC injector chain is the sequence of accelerators and beamlines at CERN that progressively boost and prepare particle beams before they are injected into the Large Hadron Collider.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4937c9c188190aaa216f6b466f452 completed March 1, 2026, 7:29 p.m.
NER Named-entity recognition batch_69a4ab7d3984819089aefbf12d3b3c2c completed March 1, 2026, 9:11 p.m.
NED1 Entity disambiguation (via context triple) batch_69a79291d51c81908163024842300a6e completed March 4, 2026, 2:01 a.m.
Created at: March 1, 2026, 7:38 p.m.