Triple

T822975
Position Surface form Disambiguated ID Type / Status
Subject Croton Falls Dam E17789 entity
Predicate instanceOf P0 FINISHED
Object gravity dam C2859 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: gravity dam
Context triple: [Croton Falls Dam, instanceOf, gravity dam]
  • A. concrete dam
    A concrete dam is a massive engineered barrier constructed primarily from concrete to hold back and control the flow of water in a river or reservoir.
  • B. concrete gravity dam chosen
    A concrete gravity dam is a massive structure made of concrete that resists the horizontal thrust of water primarily through its own weight and the force of gravity.
  • C. arch-gravity dam
    An arch-gravity dam is a concrete dam that combines the curved, arch action of an arch dam with the mass and weight-based stability of a gravity dam to resist water pressure.
  • D. masonry gravity dam
    A masonry gravity dam is a massive structure built from stone or brick masonry whose own weight resists the horizontal pressure of the water it retains.
  • E. seawall
    A seawall is a coastal defense structure built parallel to the shoreline to protect land and infrastructure from wave action, erosion, and storm surges.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4937bcaac8190a322524ac6f45a5a completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:38 p.m.