Triple

T822911
Position Surface form Disambiguated ID Type / Status
Subject Paraná River E17787 entity
Predicate hydropowerImportance P20913 FINISHED
Object one of the world’s most important rivers for hydroelectric power LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: one of the world’s most important rivers for hydroelectric power | Statement: [Paraná River, hydropowerImportance, one of the world’s most important rivers for hydroelectric power]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hydropowerImportance
Context triple: [Paraná River, hydropowerImportance, one of the world’s most important rivers for hydroelectric power]
  • A. hasHydroelectricProject
    Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
  • B. powerplantRole
    Indicates that one entity serves in a specific functional or operational role relative to a power plant.
  • C. powerplant
    Indicates that an entity functions as a facility or installation where energy sources are converted into usable power, typically electricity.
  • D. majorReservoir
    Indicates that one entity functions as a primary or significant water-storage reservoir associated with another entity.
  • E. waterInfrastructure
    Indicates the existence, development, or management of systems and facilities that supply, store, treat, or distribute water between entities.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4937bcaac8190a322524ac6f45a5a completed March 1, 2026, 7:28 p.m.
NER Named-entity recognition batch_69a4ab976094819086d676404d745750 completed March 1, 2026, 9:11 p.m.
PD Predicate disambiguation batch_69a4aa76a7808190ac7fd9ba1a4cebcb completed March 1, 2026, 9:07 p.m.
PDg Predicate description generation batch_69a4ab9634948190b25ea1b2e34df87d completed March 1, 2026, 9:11 p.m.
Created at: March 1, 2026, 7:38 p.m.