Triple
T8226205
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | PPPs |
E192178
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | standardized guideline |
C989
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: standardized guideline Context triple: [PPPs, instanceOf, standardized guideline]
-
A.
normative guideline
chosen
A normative guideline is a prescriptive rule or principle that defines how things ought to be done or how people ought to behave within a particular context or system.
-
B.
ICH guideline
An ICH guideline is an internationally harmonized technical standard developed by the International Council for Harmonisation to ensure the quality, safety, and efficacy of pharmaceuticals across different regulatory regions.
-
C.
official standard
An official standard is an authoritative, formally approved specification or guideline established by a recognized body to ensure consistency, compatibility, and quality across products, services, or processes.
-
D.
standard
A standard is an established norm, rule, or benchmark used to measure, compare, or guide quality, performance, or behavior within a particular context.
-
E.
ISO guide
An ISO guide is a standardized document that provides principles, recommendations, or procedures to support the consistent development, implementation, and interpretation of International Organization for Standardization (ISO) standards.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82db5b90819085d1ad7c2e27bfcc |
completed | March 30, 2026, 2:04 p.m. |
Created at: March 30, 2026, 5:45 p.m.