Triple

T8222448
Position Surface form Disambiguated ID Type / Status
Subject Thanet Offshore Wind Farm E192095 entity
Predicate gridConnectionAgreementWith P81710 FINISHED
Object National Grid Electricity Transmission E223457 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: National Grid Electricity Transmission | Statement: [Thanet Offshore Wind Farm, gridConnectionAgreementWith, National Grid Electricity Transmission]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: National Grid Electricity Transmission
Context triple: [Thanet Offshore Wind Farm, gridConnectionAgreementWith, National Grid Electricity Transmission]
  • A. National Grid chosen
    National Grid is a major British multinational electricity and gas utility company responsible for operating and maintaining the high-voltage power transmission network in Great Britain.
  • B. Northern Powergrid
    Northern Powergrid is a UK-based electricity distribution network operator responsible for delivering power to homes and businesses across the North East, Yorkshire, and northern Lincolnshire.
  • C. North American power transmission grid
    The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
  • D. OS National Grid
    OS National Grid is the national coordinate reference system used in Great Britain for accurately mapping and locating geographic features.
  • E. ScottishPower transmission network
    The ScottishPower transmission network is a high-voltage electricity transmission system in the UK that transports power from generators like offshore wind farms to regional distribution networks and consumers.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: gridConnectionAgreementWith
Context triple: [Thanet Offshore Wind Farm, gridConnectionAgreementWith, National Grid Electricity Transmission]
  • A. gridInterconnection
    Indicates a connection or linkage between electrical grids that allows power exchange or coordinated operation.
  • B. gridConnectionCompletionDate
    Indicates the date on which a connection to the electrical grid is fully completed and becomes operational.
  • C. gridConnectionCountry
    Indicates that an entity’s electrical grid is connected to, or integrated with, the power grid of a specified country.
  • D. hasGridConnection
    Indicates that an entity is connected to an electrical grid, enabling it to receive or supply grid-based power.
  • E. interconnectionMethodToOtherGrids
    Indicates the method or mechanism by which one grid is physically or operationally interconnected to other grids.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82c9a8ac81908b011c38698456e4 completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb77cae2948190ae4507b75b5d5784 completed March 31, 2026, 7:29 a.m.
NED1 Entity disambiguation (via context triple) batch_69ccee09ac548190a9988ff77d43e77e completed April 1, 2026, 10:06 a.m.
PD Predicate disambiguation batch_69cb36af41e081909dee92b9bc4947f1 completed March 31, 2026, 2:51 a.m.
PDg Predicate description generation batch_69cb4d9b03108190a6785834f21ff75e completed March 31, 2026, 4:29 a.m.
Created at: March 30, 2026, 5:45 p.m.