Triple
T8222448
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Thanet Offshore Wind Farm |
E192095
|
entity |
| Predicate | gridConnectionAgreementWith |
P81710
|
FINISHED |
| Object | National Grid Electricity Transmission |
E223457
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: National Grid Electricity Transmission | Statement: [Thanet Offshore Wind Farm, gridConnectionAgreementWith, National Grid Electricity Transmission]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: National Grid Electricity Transmission Context triple: [Thanet Offshore Wind Farm, gridConnectionAgreementWith, National Grid Electricity Transmission]
-
A.
National Grid
chosen
National Grid is a major British multinational electricity and gas utility company responsible for operating and maintaining the high-voltage power transmission network in Great Britain.
-
B.
Northern Powergrid
Northern Powergrid is a UK-based electricity distribution network operator responsible for delivering power to homes and businesses across the North East, Yorkshire, and northern Lincolnshire.
-
C.
North American power transmission grid
The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
-
D.
OS National Grid
OS National Grid is the national coordinate reference system used in Great Britain for accurately mapping and locating geographic features.
-
E.
ScottishPower transmission network
The ScottishPower transmission network is a high-voltage electricity transmission system in the UK that transports power from generators like offshore wind farms to regional distribution networks and consumers.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: gridConnectionAgreementWith Context triple: [Thanet Offshore Wind Farm, gridConnectionAgreementWith, National Grid Electricity Transmission]
-
A.
gridInterconnection
Indicates a connection or linkage between electrical grids that allows power exchange or coordinated operation.
-
B.
gridConnectionCompletionDate
Indicates the date on which a connection to the electrical grid is fully completed and becomes operational.
-
C.
gridConnectionCountry
Indicates that an entity’s electrical grid is connected to, or integrated with, the power grid of a specified country.
-
D.
hasGridConnection
Indicates that an entity is connected to an electrical grid, enabling it to receive or supply grid-based power.
-
E.
interconnectionMethodToOtherGrids
Indicates the method or mechanism by which one grid is physically or operationally interconnected to other grids.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82c9a8ac81908b011c38698456e4 |
completed | March 30, 2026, 2:03 p.m. |
| NER | Named-entity recognition | batch_69cb77cae2948190ae4507b75b5d5784 |
completed | March 31, 2026, 7:29 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ccee09ac548190a9988ff77d43e77e |
completed | April 1, 2026, 10:06 a.m. |
| PD | Predicate disambiguation | batch_69cb36af41e081909dee92b9bc4947f1 |
completed | March 31, 2026, 2:51 a.m. |
| PDg | Predicate description generation | batch_69cb4d9b03108190a6785834f21ff75e |
completed | March 31, 2026, 4:29 a.m. |
Created at: March 30, 2026, 5:45 p.m.