Triple
T8222438
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Thanet Offshore Wind Farm |
E192095
|
entity |
| Predicate | hasPlannedExpansion |
P54843
|
FINISHED |
| Object | Thanet Extension Offshore Wind Farm |
E192095
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Thanet Extension Offshore Wind Farm | Statement: [Thanet Offshore Wind Farm, hasPlannedExpansion, Thanet Extension Offshore Wind Farm]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Thanet Extension Offshore Wind Farm Context triple: [Thanet Offshore Wind Farm, hasPlannedExpansion, Thanet Extension Offshore Wind Farm]
-
A.
Thanet Offshore Wind Farm
chosen
Thanet Offshore Wind Farm is a large offshore wind power facility located off the coast of Kent, England, known for being one of the earliest and once the largest operational offshore wind farms in the world.
-
B.
Gunfleet Sands Offshore Wind Farm
Gunfleet Sands Offshore Wind Farm is a large offshore wind power facility in the Thames Estuary off the coast of Essex, England, contributing renewable electricity to the UK grid.
-
C.
North Hoyle Offshore Wind Farm
North Hoyle Offshore Wind Farm is one of the United Kingdom’s early commercial offshore wind power projects, located off the coast of North Wales and contributing renewable electricity to the national grid.
-
D.
Ormonde Offshore Wind Farm
Ormonde Offshore Wind Farm is a UK offshore wind power facility located in the Irish Sea off the coast of Barrow-in-Furness, Cumbria, generating renewable electricity from a series of seabed-mounted wind turbines.
-
E.
Greater Gabbard Offshore Wind Farm
The Greater Gabbard Offshore Wind Farm is a large-scale offshore wind power project in the North Sea off the Suffolk coast of England that became the world’s largest offshore wind farm upon its completion.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: hasPlannedExpansion Context triple: [Thanet Offshore Wind Farm, hasPlannedExpansion, Thanet Extension Offshore Wind Farm]
-
A.
plannedExpansion
chosen
Indicates that an entity has a scheduled or intended increase in size, capacity, scope, or presence in the future.
-
B.
hasExpansion
Indicates that one entity serves as a larger, extended, or elaborated form of another entity.
-
C.
plannedExtensionTo
Indicates that one entity is intended or scheduled to be extended, expanded, or continued by another entity in the future.
-
D.
expansionProject
Indicates a project whose primary purpose is to enlarge, extend, or increase the capacity, scope, or reach of something.
-
E.
majorExpansionUnder
Indicates that one entity is undergoing or has undergone a significant enlargement, growth, or extension while being under the authority, control, or scope of another entity.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82c9a8ac81908b011c38698456e4 |
completed | March 30, 2026, 2:03 p.m. |
| NER | Named-entity recognition | batch_69cb77cae2948190ae4507b75b5d5784 |
completed | March 31, 2026, 7:29 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cd94d541f08190adf1fe7020b3c39b |
completed | April 1, 2026, 9:57 p.m. |
| PD | Predicate disambiguation | batch_69cb36af41e081909dee92b9bc4947f1 |
completed | March 31, 2026, 2:51 a.m. |
Created at: March 30, 2026, 5:45 p.m.