Triple
T8194265
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | U.S. Army Yuma Proving Ground |
E191387
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | weapons testing facility |
C23640
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: weapons testing facility Context triple: [U.S. Army Yuma Proving Ground, instanceOf, weapons testing facility]
-
A.
nuclear weapons production facility
A nuclear weapons production facility is a highly secured industrial complex where fissile materials are processed and assembled into components and complete systems for nuclear armaments.
-
B.
weapons-grade plutonium production facility
A weapons-grade plutonium production facility is an industrial complex designed to produce, extract, and process plutonium with isotopic compositions suitable for use in nuclear weapons.
-
C.
former nuclear test site
A former nuclear test site is a geographically defined area where nuclear weapons or devices were previously detonated for testing purposes and which may still be subject to environmental monitoring, contamination concerns, and restricted use.
-
D.
nuclear weapons assembly plant
A nuclear weapons assembly plant is a highly secure industrial facility where nuclear and non-nuclear components are manufactured, integrated, and tested to produce complete nuclear weapons in compliance with strict safety, security, and regulatory standards.
-
E.
nuclear weapons component plant
A nuclear weapons component plant is an industrial facility dedicated to designing, manufacturing, and assembling specialized parts and subsystems used in the construction and maintenance of nuclear weapons.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82c6e9548190a4c5ca14516e4417 |
completed | March 30, 2026, 2:03 p.m. |
Created at: March 30, 2026, 5:42 p.m.