Triple

T8187900
Position Surface form Disambiguated ID Type / Status
Subject Ebbw Vale E191231 entity
Predicate hasRiver P165 FINISHED
Object Ebbw River E474427 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ebbw River | Statement: [Ebbw Vale, hasRiver, Ebbw River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ebbw River
Context triple: [Ebbw Vale, hasRiver, Ebbw River]
  • A. River Ebbw chosen
    River Ebbw is a river in south-east Wales that flows through former industrial valleys of Gwent before joining the River Usk near Newport.
  • B. River Dwyryd
    River Dwyryd is a river in Gwynedd, Wales, that flows through Snowdonia to reach the estuary near Porthmadog on the west coast.
  • C. Rhymney River
    The Rhymney River is a river in South Wales that flows through the city of Cardiff before reaching the Bristol Channel.
  • D. River Honddu
    River Honddu is a small river in Powys, Wales, known for flowing through the Brecon Beacons area before joining the River Monnow.
  • E. Ogmore River
    The Ogmore River is a river in South Wales that flows through the Vale of Glamorgan to the Bristol Channel near the village of Ogmore-by-Sea.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82c5b6948190a583c096fb0a6c71 completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb4d9f4a488190b39bdc1792646914 completed March 31, 2026, 4:29 a.m.
NED1 Entity disambiguation (via context triple) batch_69ce4d731b248190a440e1289e655b74 completed April 2, 2026, 11:05 a.m.
Created at: March 30, 2026, 5:41 p.m.