Triple

T81832
Position Surface form Disambiguated ID Type / Status
Subject Pioneer plaque project E1644 entity
Predicate instanceOf P0 FINISHED
Object NASA project C302 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: NASA project
Context triple: [Pioneer plaque project, instanceOf, NASA project]
  • A. NASA mission component
    A NASA mission component is a distinct hardware, software, or operational element designed to perform a specific function that contributes to the overall objectives and success of a NASA space mission.
  • B. space communication project
    A space communication project is an organized effort to design, develop, and operate systems that enable reliable data and signal exchange between spacecraft, satellites, and ground stations.
  • C. United States government program chosen
    A United States government program is an organized set of activities, services, or regulations funded and administered by federal agencies to achieve specific public policy goals or address national needs.
  • D. World War II project
    A World War II project is a structured investigation or creative work that explores specific aspects of the Second World War—such as events, people, technology, or impacts—using historical sources to analyze and present findings.
  • E. research project
    A research project is a structured, systematic investigation designed to answer specific questions or test hypotheses by collecting, analyzing, and interpreting data within a defined scope and timeframe.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a24c8150408190910a693eb51c1f71 completed Feb. 28, 2026, 2:01 a.m.
Created at: Feb. 28, 2026, 2:06 a.m.