Triple
T81303
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Aquia Creek sandstone |
E1632
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | construction material |
C1617
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: construction material Context triple: [Aquia Creek sandstone, instanceOf, construction material]
-
A.
building
A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
-
B.
civil engineer
A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
-
C.
architect
An architect is a professional who plans, designs, and oversees the construction of buildings and other structures, balancing functionality, safety, aesthetics, and client needs.
-
D.
building complex
A building complex is a group of interconnected or related structures on a shared site that function together as a unified facility or environment.
-
E.
engineering journal
An engineering journal is a periodical publication that presents peer-reviewed research, technical developments, and practical applications in various fields of engineering.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a24c60d19c8190a1b6c105ca59ef5b |
completed | Feb. 28, 2026, 2:01 a.m. |
Created at: Feb. 28, 2026, 2:06 a.m.