Triple

T8118480
Position Surface form Disambiguated ID Type / Status
Subject Splash Mountain E189539 entity
Predicate instanceOf P0 FINISHED
Object log flume ride C8343 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: log flume ride
Context triple: [Splash Mountain, instanceOf, log flume ride]
  • A. water ride chosen
    A water ride is an amusement attraction that uses water-filled channels, flumes, or pools to move riders through themed environments, often featuring splashes, drops, and soaking elements for entertainment.
  • B. launched roller coaster
    A launched roller coaster is a type of roller coaster that uses propulsion systems such as linear motors, hydraulic launches, or compressed air to rapidly accelerate trains to high speeds without relying on a traditional lift hill.
  • C. aerial observation ride
    An aerial observation ride is an amusement attraction that lifts passengers to an elevated height, often rotating or moving slowly, to provide panoramic views of the surrounding area.
  • D. roller coaster
    A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
  • E. Six Flags park
    A Six Flags park is a large regional amusement park that features a variety of thrill rides, family attractions, live entertainment, and themed areas, typically branded under the Six Flags corporate identity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82baad008190ab2859712b9b1607 completed March 30, 2026, 2:03 p.m.
Created at: March 30, 2026, 5:33 p.m.