Triple

T8097050
Position Surface form Disambiguated ID Type / Status
Subject Tehran Metro Line 8 E189010 entity
Predicate isInPlanningOrOperation P24929 FINISHED
Object true LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Tehran Metro Line 8, isInPlanningOrOperation, true]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isInPlanningOrOperation
Context triple: [Tehran Metro Line 8, isInPlanningOrOperation, true]
  • A. isOperatedIn
    Indicates that an entity carries out its operations or activities within a specified location, region, or jurisdiction.
  • B. hasPlanningStatus chosen
    Indicates that an entity is associated with a particular stage, condition, or outcome in a planning or approval process.
  • C. hasPlanningLevel
    Indicates that an entity is associated with a specific stage, tier, or granularity within a planning or scheduling hierarchy.
  • D. plannedUnder
    Indicates that one entity has been scheduled, organized, or arranged to occur within the scope, authority, or framework of another entity.
  • E. usedInOperation
    Indicates that something (such as a tool, method, or resource) is employed or applied during the execution of a particular operation or procedure.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82b886d88190a9cba0d5a4a27521 completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb429319048190b612c8060a9a24d2 completed March 31, 2026, 3:42 a.m.
PD Predicate disambiguation batch_69cb04a14cd88190a79ed26cbeec1c33 completed March 30, 2026, 11:17 p.m.
Created at: March 30, 2026, 5:30 p.m.