Triple

T8096783
Position Surface form Disambiguated ID Type / Status
Subject Karaj Dam E189004 entity
Predicate partOf P40 FINISHED
Object Iran national power grid
The Iran national power grid is the nationwide interconnected electricity transmission and distribution network that supplies power across Iran from major generation sources such as dams, thermal plants, and other energy facilities.
E711869 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Iran national power grid | Statement: [Karaj Dam, partOf, Iran national power grid]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Iran national power grid
Context triple: [Karaj Dam, partOf, Iran national power grid]
  • A. Pakistan national power grid
    The Pakistan national power grid is the countrywide high-voltage transmission network that distributes electricity from major generation sources, such as dams and power plants, to regional and local distribution systems across Pakistan.
  • B. North American power transmission grid
    The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
  • C. Uri I Power Station
    Uri I Power Station is a major hydroelectric power facility in Jammu and Kashmir, India, utilizing water from the Jhelum River to generate electricity.
  • D. IranShahr Terminal
    IranShahr Terminal is a planned new passenger terminal complex intended to expand and modernize facilities at Tehran Imam Khomeini International Airport in Iran.
  • E. Matiari–Lahore HVDC transmission line
    The Matiari–Lahore HVDC transmission line is a high-voltage direct current power transmission project in Pakistan that delivers electricity from southern generation hubs to demand centers in the north as part of the China–Pakistan Economic Corridor.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Iran national power grid
Triple: [Karaj Dam, partOf, Iran national power grid]
Generated description
The Iran national power grid is the nationwide interconnected electricity transmission and distribution network that supplies power across Iran from major generation sources such as dams, thermal plants, and other energy facilities.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Iran national power grid
Target entity description: The Iran national power grid is the nationwide interconnected electricity transmission and distribution network that supplies power across Iran from major generation sources such as dams, thermal plants, and other energy facilities.
  • A. Pakistan national power grid
    The Pakistan national power grid is the countrywide high-voltage transmission network that distributes electricity from major generation sources, such as dams and power plants, to regional and local distribution systems across Pakistan.
  • B. North American power transmission grid
    The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
  • C. Uri I Power Station
    Uri I Power Station is a major hydroelectric power facility in Jammu and Kashmir, India, utilizing water from the Jhelum River to generate electricity.
  • D. IranShahr Terminal
    IranShahr Terminal is a planned new passenger terminal complex intended to expand and modernize facilities at Tehran Imam Khomeini International Airport in Iran.
  • E. Matiari–Lahore HVDC transmission line
    The Matiari–Lahore HVDC transmission line is a high-voltage direct current power transmission project in Pakistan that delivers electricity from southern generation hubs to demand centers in the north as part of the China–Pakistan Economic Corridor.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82b886d88190a9cba0d5a4a27521 completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb429319048190b612c8060a9a24d2 completed March 31, 2026, 3:42 a.m.
NED1 Entity disambiguation (via context triple) batch_69cc641a4b4881908a1aec4bc2ed619e completed April 1, 2026, 12:17 a.m.
NEDg Description generation batch_69cc68647cec81909736383fbe73d2e8 completed April 1, 2026, 12:35 a.m.
NED2 Entity disambiguation (via description) batch_69cc69b93bbc8190be2338182dd57b17 completed April 1, 2026, 12:41 a.m.
Created at: March 30, 2026, 5:30 p.m.